The Tunnel S13E8
Previous
The Tunnel
S13E08 — The Wayland House - 8
Next
The Tunnel poster

The Tunnel

S13E08 The Wayland House - 8

1991-10-24

The master carpenter finishes the curved frame for the front portico deck, while the general contractor inspects the newly installed engineered wood framing for both the kitchen and the master bath. Meanwhile, excavator Herb Brockert starts digging the leaching field for the new septic system, and asbestos is being safely removed from the pipes in the basement.

Season 13 Episodes