The Tunnel S31E25
Previous
The Tunnel
S31E25 — Roxbury; Looking Back and Looking Ahead
Next
The Tunnel poster

The Tunnel

S31E25 Roxbury; Looking Back and Looking Ahead

2010-03-27

As the final week in Roxbury approaches, tile contractor Angelo McRae teaches Kevin the process of installing meshed white subway tiles along with a rail cap for the kitchen backsplash. Kevin then heads to our Washington, D.C. project house to meet the family who has moved in and to see the results of our last non-profit development project. Meanwhile, general contractor Tom Silva assists lead carpenter Colin Paterson in customizing and installing the stair treads and newel post for the newly constructed stairs.

Season 31 Episodes