The Tunnel
S35E21 Arlington 2014: Part 13: Brick, Trim and Tile
The team begins by laying down a new sidewalk. Unique moldings are carefully placed to enhance the space. The homeowner selects stylish tiles that reflect their taste. Meanwhile, fresh doors and countertops are fitted, transforming the interior.
Season 35 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore
Jersey Shore Rebuilds 2013 Part 2: Drastic Measures
Jersey Shore Rebuilds 2013 Part 3: Getting to Work
Jersey Shore Rebuilds 2013 Part 4: Built for Speed
Jersey Shore Rebuilds 2013 Part 5: Lines in the Sand
Jersey Shore Rebuilds 2013 Part 6: Go With the Flow
Jersey Shore Rebuilds 2013 Part 7: Stories From Sea Level
Jersey Shore Rebuilds 2013 Part 8: One Year Later
Arlington 2014: Part 1: A New Project
Arlington 2014: Part 2: Old House Discoveries
Arlington 2014: Part 3: Concrete Jungle
Arlington 2014: Part 4: Quest for a Dry Basement
Arlington 2014: Part 5: Getting to Level
Arlington 2014: Part 6: Additional Details
Arlington 2014: Part 7: Arlington Heights
Arlington 2014: Part 8: Italianate Inspiration
Arlington 2014: Part 9: Deadliest Old House?
Arlington 2014: Part 10: Old World New World
Arlington 2014: Part 11: House vs. Nature
Arlington 2014: Part 12: Water Water Everywhere
Arlington 2014: Part 13: Brick, Trim and Tile
Arlington 2014: Part 14: Soapstone, Marble, Oval Picture Frame
Arlington 2014: Part 15: Made in the Shade
Arlington 2014: Part 16: Decorative Details
Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding
Arlington 2014: Part 18: Italianate Renaissance