The Tunnel
S41E04 The Westerly Ranch House: Raise a Second Story
The pre-constructed gambrel roof sections are lifted into place, followed by the assembly of the second-floor walls. Three fresh apprentices join the team through the Generation Next initiative. Tom Silva teaches them the techniques for measuring and cutting roof rafters. Meanwhile, Richard Trethewey collaborates with an engineer tasked with creating a septic system tailored for the project.
Season 41 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
The Westerly Ranch House: A Ranch Out Westerly
The Westerly Ranch House: Chimney Down and Walls Up
The Westerly Ranch House: The Open Concept
The Westerly Ranch House: Raise a Second Story
The Westerly Ranch House: Decking for Beginners
The Westerly Ranch House: Return to Paradise
The Westerly Ranch House: The Doors
The Westerly Ranch House: Tanks for the Propane
The Westerly Ranch House: Rockin' the Granite
The Westerly Ranch House: Pining for Old Pine
The Westerly Ranch House: Save the Flagpole
The Westerly Ranch House: Seaside Transformation
Rebuilding Paradise: Paradise Lost
Rebuilding Paradise: Out of the Ashes
Rebuilding Paradise: No Pain No Gain
Rebuilding Paradise: Paradise Strong
The Cape Ann House: Cape Ann Shingle Style
The Cape Ann House: Between a Rock and Hardwood
The Cape Ann House: Losing Our Truss
The Cape Ann House: Hard Work Ahead
The Cape Ann House: Shingled Out
The Cape Ann House: Tiling Is a Family Affair
The Cape Ann House: Window on Restoration
The Cape Ann House: Don't Rip It, Restore It
The Cape Ann House: Master Craftsmen
The Cape Ann House: Move In Day