The Tunnel
S47E15 Needham: Getting Our Ducts in a Row
Richard connects with the HVAC subcontractors who are on site to update the ductwork and enhance the system's efficiency. On the third floor, Charlie showcases the ceiling removal process to prepare for the installation of new insulation. At the same time, Tommy and Kevin are busy putting in a double-hung window in the dining room that opens up to the front porch.
Season 47 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Asheville Rebuilds
Asheville: Rising Out of the Muck
Asheville: All Clear
Asheville: Waterproof Work
Asheville: Out of the Mountains
Asheville: Community Carpenters
Asheville: Boulder Dash
Asheville: Bricks, Blinds and Brews
Asheville: Silt and Stone
Asheville: Putting Down Roots
Asheville: Coming Home
Needham: Needed in Needham
Needham: Pouring It On
Needham: Reduce, Reside, Recycle
Needham: Getting Our Ducts in a Row
Needham: Trim and Proper
Needham: Foot Traffic
Needham: Going Through Customs
Needham: Everything Old Is New Again
Needham: Let It Show
Walpole ADU: Welcome to Walpole
Walpole ADU: An ADU Takes Shape
Walpole ADU: Retro Vibes
Walpole ADU: An Attic ADU
Walpole ADU: Board & Batten Down The Hatches
Walpole ADU: A Double Homecoming