The Tunnel
S44E17 Ipswich: Prep-Work
The groundwork for the new foundation kicks off as a historic cistern, dating back centuries, is discovered. Experts evaluate the aged timber framework, carefully retrieving the original floorboards and roof sheathing for future restoration. Meanwhile, the sill undergoes a thorough inspection to check for any signs of water damage.
Season 44 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Atlanta: Welcome to Atlanta
Atlanta: Unsafe Structures
Atlanta: School of HVAC
Atlanta: Cardboard Kitchen
Atlanta: Whole House Protection
Atlanta: Respecting the Old While Adding the New
Atlanta: Repointed and Planted
Atlanta: Families Meet
Newburyport: Shipwrights and Sea Captains
Newburyport: Powering Through
Newburyport: Demo Find
Newburyport: Design Talk
Newburyport: Off-the-Shelf Custom Look
Newburyport: Bed Race
Ipswich: This Really Old House
Ipswich: Secrets Behind the Wall
Ipswich: Prep-Work
Ipswich: Careful Considerations
Ipswich: Below Grade Plumbing
Ipswich: Rebuilding Centuries
Ipswich: Exposing Problems
Ipswich: First Things First
Ipswich: Factory Built
Ipswich: New Life
Ipswich: Look-Alike
Ipswich: A Period Restoration