The Tunnel S44E23
Previous
The Tunnel
S44E23 — Ipswich: Factory Built
Next
The Tunnel poster

The Tunnel

S44E23 Ipswich: Factory Built

2023-05-18

Kevin leads an extensive tour showcasing the ongoing advancements. The team addresses rainwater management and sets up a harvesting system. Visitors explore a workshop dedicated to handcrafted lighting. On-site, the new boathouse, prefabricated in a factory, is put together. Additionally, winter preparations are made as plants are secured in their spots.

Season 44 Episodes