The Tunnel
S33E18 Barrington; Hurricane Irene
As Hurricane Irene approaches, the team diligently readies the house for the impending storm while simultaneously starting the framework for the second story. Their focus shifts between reinforcing the structure and ensuring everything is secure, all while keeping an eye on the weather updates. Tensions rise as they race against time, balancing the urgency of their construction efforts with the looming threat of the hurricane.
Season 33 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Bedford | Welcome to the Bedford Project
Bedford | And the Work Begins
Bedford | Work on the Addition Begins
Bedford | New Entrance, Old Bricks
Bedford | Yard and New Gable Wall
Bedford | New Space Revealed
Bedford | Insulation, Roofing
Bedford | Kitchen Inspiration
Bedford | A New Driveway
Bedford | Interior Design Ideas
Bedford | Milestones In and Out
Bedford | A Major Milestone
Bedford | On the Right Path
Bedford | Doors and Tabletops
Bedford | Final Touches
Bedford | Final Reveal
Barrington; An Introduction
Barrington; Hurricane Irene
Barrington; Building a Clambake!
Barrington; A Newport Mansion
Barrington; Coastal Landscape
Barrington; The Finishes Begin
Barrington; Cherry Kitchen
Barrington; Wall Dressing
Barrington; The Finish Line
Barrington; Another Project Wraps