The Tunnel
S33E06 Bedford | New Space Revealed
The family room extension is now framed and sheathed. The team works on installing new post supports in the kitchen to make room for a new stove vent hood, while also repairing the window sash to ensure everything functions smoothly.
Season 33 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Bedford | Welcome to the Bedford Project
Bedford | And the Work Begins
Bedford | Work on the Addition Begins
Bedford | New Entrance, Old Bricks
Bedford | Yard and New Gable Wall
Bedford | New Space Revealed
Bedford | Insulation, Roofing
Bedford | Kitchen Inspiration
Bedford | A New Driveway
Bedford | Interior Design Ideas
Bedford | Milestones In and Out
Bedford | A Major Milestone
Bedford | On the Right Path
Bedford | Doors and Tabletops
Bedford | Final Touches
Bedford | Final Reveal
Barrington; An Introduction
Barrington; Hurricane Irene
Barrington; Building a Clambake!
Barrington; A Newport Mansion
Barrington; Coastal Landscape
Barrington; The Finishes Begin
Barrington; Cherry Kitchen
Barrington; Wall Dressing
Barrington; The Finish Line
Barrington; Another Project Wraps