The Tunnel
S33E04 Bedford | New Entrance, Old Bricks
The team focuses on constructing a new roof that will sit atop the current one, ensuring a robust foundation. Concurrently, they tackle the repair of the exterior chimney, restoring it to its former glory. Additionally, the craftsmen skillfully integrate new bricks with the old, preserving the building's historical charm while enhancing its structural integrity.
Season 33 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Bedford | Welcome to the Bedford Project
Bedford | And the Work Begins
Bedford | Work on the Addition Begins
Bedford | New Entrance, Old Bricks
Bedford | Yard and New Gable Wall
Bedford | New Space Revealed
Bedford | Insulation, Roofing
Bedford | Kitchen Inspiration
Bedford | A New Driveway
Bedford | Interior Design Ideas
Bedford | Milestones In and Out
Bedford | A Major Milestone
Bedford | On the Right Path
Bedford | Doors and Tabletops
Bedford | Final Touches
Bedford | Final Reveal
Barrington; An Introduction
Barrington; Hurricane Irene
Barrington; Building a Clambake!
Barrington; A Newport Mansion
Barrington; Coastal Landscape
Barrington; The Finishes Begin
Barrington; Cherry Kitchen
Barrington; Wall Dressing
Barrington; The Finish Line
Barrington; Another Project Wraps