The Tunnel S45E10
Previous
The Tunnel
S45E10 — Lexington: Seven Layer Floors
Next
The Tunnel poster

The Tunnel

S45E10 Lexington: Seven Layer Floors

2024-01-11

The construction team elevates the slab-on-grade foundation, while investigating accessible audiovisual options. Preparations kick off for a curbless shower installation, ensuring a seamless design. Additionally, they work on fitting an automatic zero-threshold door for enhanced accessibility.

Season 45 Episodes