The Tunnel
S45E11 Lexington: Electrical Bond
Prior to the crane's arrival for the therapy pool installation, the copper bonding system is put in place. Meanwhile, the chosen tiles are unveiled. The entrance ramp now features a snow-melting system and receives its final concrete surface. Additionally, the elevator disconnects are successfully set up.
Season 45 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Lexington: On a Mission
Lexington: Shore We Can
Lexington: The Big Dig
Lexington: Engineered For Accessibility
Lexington: Gone Geo
Lexington: Reworked and Rewired
Lexington: Ramping Up
Lexington: Drop in the Gutter
Lexington: Phased Out
Lexington: Seven Layer Floors
Lexington: Electrical Bond
Lexington: Upcycled
Lexington: Install With Care
Lexington: All in the Family
Lexington: Judgement Day
Lexington: Accessible Made Modern
Glen Ridge: Multi-Generational
Glen Ridge: Vintage
Glen Ridge: Small But Mighty
Glen Ridge: QR Construction
Glen Ridge: Roughed In
Glen Ridge: Next Level Tight
Glen Ridge: A Breath of Fresh Air
Glen Ridge: Tested and Approved
Glen Ridge: Spring Forward
Glen Ridge: Next Generation Victorian