The Tunnel
S45E09 Lexington: Phased Out
The renovation of the house is organized into distinct phases to streamline the process. The back foundation receives a new stucco coating while the kitchen cabinets are chosen. Siding is added to the exterior, and the back patio is set up with adequate drainage to prevent water issues.
Season 45 Episodes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Lexington: On a Mission
Lexington: Shore We Can
Lexington: The Big Dig
Lexington: Engineered For Accessibility
Lexington: Gone Geo
Lexington: Reworked and Rewired
Lexington: Ramping Up
Lexington: Drop in the Gutter
Lexington: Phased Out
Lexington: Seven Layer Floors
Lexington: Electrical Bond
Lexington: Upcycled
Lexington: Install With Care
Lexington: All in the Family
Lexington: Judgement Day
Lexington: Accessible Made Modern
Glen Ridge: Multi-Generational
Glen Ridge: Vintage
Glen Ridge: Small But Mighty
Glen Ridge: QR Construction
Glen Ridge: Roughed In
Glen Ridge: Next Level Tight
Glen Ridge: A Breath of Fresh Air
Glen Ridge: Tested and Approved
Glen Ridge: Spring Forward
Glen Ridge: Next Generation Victorian