The Tunnel S45E13
Previous
The Tunnel
S45E13 — Lexington: Install With Care
Next
The Tunnel poster

The Tunnel

S45E13 Lexington: Install With Care

2024-02-01

The team kicks off the installation of the geothermal heating systems, starting with the setup of in-wall lighting to brighten the entrance ramp. They also work on positioning an offset p-trap. In a creative break, the crew visits a glass-blowing workshop to appreciate the art. Meanwhile, the installation of grab bars commences, ensuring safety and accessibility in the space.

Season 45 Episodes